Skip to main content

Formatting reference

A complete list of every setting in the Gantt Chart's Format pane, grouped by card, with its effect and default value. For task-based walkthroughs, see the customization guides linked at the bottom.

Open the Format pane by selecting the visual and clicking the paint-roller icon. Cards appear in the order below.

📷 Screenshot: The full Format pane for the Gantt Chart with all cards collapsed, showing the card list.

Sort by​

Controls the order of sibling tasks within each hierarchy level.

PropertyOptions / rangeDefaultNotes
Sort byStart date · End date · Duration · Task name · Data orderStart date"Data order" keeps Power BI's delivered row order.
DirectionAscending · DescendingAscendingIgnored when sorting by Data order.

Appearance​

A composite card with five groups.

General​

PropertyTypeDefaultNotes
Dark modeOn / OffOffDark shell for backgrounds, text, grid lines. Ignored under high contrast.

Top bar​

PropertyTypeDefaultNotes
Show top barOn / OffOnThe bar holding search and zoom controls.
Show search barOn / OffOnThe search box within the top bar.

Timeline​

PropertyOptionsDefaultNotes
Progress styleStrip · OverlayOverlayHow progress fills the task bars.

Vertical grid​

PropertyTypeDefault
Vertical grid linesOn / OffOn

Horizontal grid​

PropertyTypeDefaultNotes
Row bandingOn / OffOffAlternating row shading.
Project grid linesOn / OffOnLines between top-level project rows.
Task grid linesOn / OffOffLines between task and sub-task rows.

Bars​

PropertyRangeDefaultNotes
Task bar height8–60 px26
Project bar height4–30 px6Summary bars.
Bar spacing2–16 px6Space above/below each bar within its row.
Project bar corner radius0–15 px3
Task bar corner radius0–15 px3

Data labels​

PropertyType / rangeDefaultNotes
Show task labelsOn / OffOffTask name to the right of each bar.
Show progress percentageOn / OffOnPrefixes label with progress % (needs Progress bar).
Show project durationOn / OffOnDuration in days beside each top-level project bar.
Font familyFontSegoe UI
Font size7–24 pt10
Bold / Italic / UnderlineOn / OffOff

Project hierarchy​

PropertyTypeDefaultNotes
Row numbersOn / OffOffWBS number column left of the task list.
Show color swatchesOn / OffOnColor chip next to each project name.
Show completion checkmarksOn / OffOnGreen checkmark on 100%-complete tasks (needs Progress bar).

Zoom and scroll​

PropertyOptionsDefaultNotes
Default zoom presetAuto Fit · Day · Week · Month · Quarter · YearAuto FitZoom level on load.
Default scroll positionStart · Today · EndStartHorizontal position on load.

Milestones​

A composite card with two groups.

Options​

PropertyType / rangeDefaultNotes
Hide markers outside barsOn / OffOffHides markers falling outside a task's start–end range.
Marker size (%)10–80%30Percentage of task bar height.

Symbols​

PropertyOptionsDefaultNotes
Symbol (per milestone column)Circle · Diamond · Square · Triangle · Star—One picker per bound milestone column.

Today line​

PropertyOptionsDefault
ShowOn / OffOn
ColorColor#D64550
StyleSolid · Dashed · DottedSolid

Dependency lines​

Only visible when Task ID and Predecessor ID are mapped.

PropertyOptions / rangeDefault
ShowOn / OffOn
ColorColor#323338
StyleSolid · Dashed · DottedSolid
Width1–5 px1

Legend​

Only visible when a Legend field is populated.

PropertyOptions / rangeDefault
ShowOn / OffOn
PositionTop · Bottom · Left · Right · Top center · Bottom center · Left center · Right centerBottom center
TitleOn / OffOff
Legend nameText(auto)
ColorColorTheme default
Font familyFontSegoe UI
Text size7–24 pt10

Data colors​

A composite card.

PropertyTypeDefaultNotes
Default colorColor#118DFFUsed with no Legend, or for parents with mixed children.
Per-value colorColor(theme palette)One swatch per legend value when a Legend field is present.

See also​